The big reason is we were joined by a wee Bateman on the 1st of March. His arrival has been lovely, wonderful, exciting. However, it has in fact, distracted us from the other things we treasure, including our house build.
Over the next few weeks we'll endeavor to lead you thru the next steps, the finishing touches and the final moment of our build.
From this point we will go room to room, because the house at 1 March was going thru a quick transformation.
Today is ... drum roll..... the bathrooms.
Before unveiling pictures it is worth saying that there are some things we had to consider when doing the bathrooms
Showers - tile or cabinet ?
Vanities - wall hung or up from the floor? How much bench space? drawers or cupboards?
Grout - white, lite grey, mid grey, dark grey or beige?
Our decisions
Showers - tile for the master bath, cabinet for the spare
Vanities - wall hung with drawers and as much bench space as possible, thanks!
Grout - mid grey
STAGE 1
Master Bath - shower - tile floor to ceiling
The brown tile and the silver tile - the brown is the floor tile and the grey is a detail tile. |
Spare bath - Tile around bath and shower cabinet
STAGE 2
Vanity drawer for the wash closet (aka toilet) - this is one of the features of our home that we really like - the separate vanity and toilet.
Spare Bath Cupboard
STAGE 3
We really love this combination of tile. |
No comments:
Post a Comment